References (Pharmaceutical industry)
e&e Verfahrenstechnik GmbH supplies:
- Turnkey plants, incl. preliminary planning and consultance, detailed engineering, purchase of components, control- and measurement technique, assemblies and assembly-supervision, commissioning, documentation and training.
- Plant components, such as evaporators of an existing or new plant-concept.
- Engineering as a preliminary- or detailed-engineering (GMP, FDA, 3A- standarts).
- All kinds of stainless steel apparatuses (construction and manufacturing of pressure tanks, incl. TÜV-inspection, tanks, heat-exchangers, incl. thermo-dynamic design, autoclaves, separators, etc.).
Apparatuses will be supplied by German or international manufacturers.
Please have a look at some of our references:
Food industry | Pharmaceutical industry | Chemical industry
Order-No.: |
1259 |
![]() |
| Business line: | Pharmaceutical industry | |
| Date of order placement: | May 1999 | |
| Completion of order: | June / July 2000 | |
| Description of order: | Design, construction, fabrication, assembly and commissioning of a double effect extraction plant, two single effect evaporation plants, one aroma recovery plant and one rectification plant for the production of extracts for plant-based drugs and other extracts for pharmaceutical products. | |
|
||
| Order-No.: | 1315 | ![]() |
| Business line: | Pharmaceutical industry | |
| Date of order placement: | October 2000 | |
| Completion of order: | December 2001 | |
| Description of order: | Design, construction, fabrication, assembly and commissioning of a 4-effect percolation plant (4 x 1 m³) for processing plant raw materials, for the production of pharmaceutical basic substances. |
|
| Order-No.: | 1346 | ![]() |
| Business line: | Pharmaceutical industry | |
| Date of order placement: | October 2000 | |
| Completion of order: | December 2001 | |
| Description of order: | Design, construction, fabrication, assembly and commissioning of a double-effect extraction plant, a double-effect evaporation plant, a rectification plant and a vacuum-drying-chamber, incl. feed-tank (heated), as well as a dry-product-mill for the production of extracts for vegetable medicines and other extracts for the pharmaceutical industry. |
|
| Order-No.: | 1437 | |
| Business line: | Pharmaceutical industry | |
| Date of order placement: | January 2002 | |
| Completion of order: | May 2003 | |
| Description of order: | Design, construction, fabrication,
assembly and commissioning of an extraction-, evaporation-,
sterilisation- and rectification plant for the processing
of plant raw materials, for the production of pharmaceutical
basic substances. |
|
| Order-No.: | 1499 | ![]() |
| Business line: | Pharmaceutical industry | |
| Date of order placement: | October 2002 | |
| Completion of order: | December 2003
|
|
| Description of order: | Design, construction, fabrication, assembly and commissioning of a 4-effect extraction plant, a 3-effect evaporation plant and a vacuum belt dryer of 60 m², including feed tank (heated) for the production of extracts for plant-based medicine. The plant is completely fabricated from AISI 316. |
|
| Order-No.: | 1502 | |
| Business line: | Pharmaceutical industry | |
| Date of order placement: | October 2002 | |
| Completion of order: | May 2003 | |
| Description of order: | Planning, construction, fabrication, assembly and commissioning of a 3-effect vacuum evaporation plant for the production of first-class coffee extracts using vapours of upstreamed production lines. |
|
| Order-No.: | 1510 | |
| Business line: | Pharmaceutical industry | |
| Date of order placement: | January 2003 | |
| Completion of order: | December 2004 | |
| Description of order: | 4-effect percolation plant 4
x 4 m³ |
|
| Order-No.: | 1527 | |
| Business line: | Pharmaceutical industry | |
| Date of order placement: | March 2003 | |
| Completion of order: | February 2004 | |
| Description of order: | Design, construction, fabrication and assembly of a CIP-plant for a pharmaceutical production line for injectable products. The design of the plant meets highest pharmaceutical hygienic standards. The plant is designed in a 3-D-layout. |
|
| Order-No.: | 1569 | |
| Business line: | Pharmaceutical industry | |
| Date of order placement: | October 2003 | |
| Completion of order: | September 2004 | |
| Description of order: | Engineering, planning, design, component supply, assembly and commissioning of a 1-effect extraction plant (liquid-liquid) for the extraction of oil-containing miscellas by means of saturated and chlorinated hydrocarbons and a 1-effect vacuum evaporation plant for concentrating hexane-containing extracts. |
|
| Order-No.: | 1640 | ![]() |
| Business line: | Pharmaceutical industry | |
| Date of order placement: | March 2005 | |
| Completion of order: | March 2006 | |
| Description of order: | Design, construction, fabrication and delivery of a vacuum belt dryer 20 m² (VBD 40) which could be enlarged up to 40 m²; for the production of pharmaceutical dried extracts. |
|
| Order-No.: | 1686 |
| Country: | Russian Federation |
| Business line: | Pharmaceutical industry |
| Date of order placement: | March 2005 |
| Completion of order: | August 2007 |
| Description of order: | Design, construction, fabrication,
supply and commissioning of an extraction centre for the
production of biogenous medicines, consisting of two extraction
lines: |